The construction of a satellite town in Veľké Kostoľany additionally increases the capacity of the existing WWTP and therefore it was necessary to design the expansion of the AS-GranBio technology from 3000 PE to 3900 PE.
The construction of a satellite town in Veľké Kostoľany additionally increases the capacity of the existing WWTP and therefore it was necessary to design the expansion of the AS-GranBio technology from 3000 PE to 3900 PE.
Implementation: March – April 2017 Project: WWTP AS-ANAcomb 400 NP for IKEA Belgrade During March and April, we implemented a WWTP for …
The first project of AGS technology AS-GranBio® was the intensification of the municipal WWTP in the village of Veľké Kostoľany. The original …
The Búč WWTP operator needed to expand the capacity of its WWTP from 1200 PE to 1600 PE, preferably in existing buildings. …
The operator of the Veselé WWTP approached us to look at the elaborated PD of the WWTP expansion from 1200 PE to …