AS-ANAcomb 400 NP for IKEA Belgrade
Implementation: March – April 2017 Project: WWTP AS-ANAcomb 400 NP for IKEA Belgrade During March and April, we implemented a WWTP for the IKEA store in Belgrade. The WWTP was
Implementation: March – April 2017 Project: WWTP AS-ANAcomb 400 NP for IKEA Belgrade During March and April, we implemented a WWTP for the IKEA store in Belgrade. The WWTP was
The first project of AGS technology AS-GranBio® was the intensification of the municipal WWTP in the village of Veľké Kostoľany. The original WWTP had SBR technology, but the operator and
The construction of a satellite town in Veľké Kostoľany additionally increases the capacity of the existing WWTP and therefore it was necessary to design the expansion of the AS-GranBio technology
The Búč WWTP operator needed to expand the capacity of its WWTP from 1200 PE to 1600 PE, preferably in existing buildings. The outflow from the WWTP is to a
The operator of the Veselé WWTP approached us to look at the elaborated PD of the WWTP expansion from 1200 PE to 2400 PE, stating that they need to increase
Implementation date: 2008 Project: cooperation in the design of the reconstruction and intensification of the WWTP of the Mountain Hotel Sliezsky dom. alpine environment irregular inflow of wastewater specific composition