WWTP Veselé 5000 PE

The operator of the Veselé WWTP approached us to look at the elaborated PD of the WWTP expansion from 1200 PE to 2400 PE, stating that they need to increase the capacity up to 5000 PE. After hydrotechnical calculations using the kinetics of the nitrogen removal balance, we determined the optimal technological set of the WWTP to achieve complete nitrification and 85% removal of total nitrogen.

In the calculations, we found that it is not necessary to expand the construction WWTP compared to the project for 2400 PE conventional technology. In addition, we canceled the proposed sludge management and proposed a more economical solution. Instead of the proposed settling tanks, we placed sludge tanks and included a line for dewatering excess sludge in the technological line.

Optimally in this case is the use of a three-line arrangement, where the discontinuous technology is changed to a continuous technology. AGS technology is also flexible, it can be designed and calculated for different levels of cleaning efficiency. The calculated cost of the WWTP extension to 5000 PE with AGS technology is lower than the designed extension to 2400 PE with the classic flake biomass technology with settling tanks and a separate sludge tank.

Komunálne čov - ASIO-SK, s.r.o.
Next articles in this section
Archive

Leave a Reply

Your email address will not be published. Required fields are marked *

Analyticky a precízne tvoríme lepšie prostredie

Implementation: March – April 2017 Project: WWTP AS-ANAcomb 400 NP for IKEA Belgrade During March and April, we implemented a WWTP for …

The first project of AGS technology AS-GranBio® was the intensification of the municipal WWTP in the village of Veľké Kostoľany. The original …

The construction of a satellite town in Veľké Kostoľany additionally increases the capacity of the existing WWTP and therefore it was necessary …

The Búč WWTP operator needed to expand the capacity of its WWTP from 1200 PE to 1600 PE, preferably in existing buildings. …